This week we have completed the following works on the individual blocks:

Block C:

  • Concrete poured for level 10
  • Steelwork erected for the podium

Block D1:

  • Decking laid for level 15
  • Internal partition walls erected
  • Prefabricated mechanical, electrical, plumbing and heating (MEPH) modules installed
  • Façade works

Block D2:

  • Decking laid for level 19
  • Internal partition walls erected
  • Prefabricated MEPH modules installed
  • Façade works

Block E:

  • Blockwork on the roof
  • MEPH works in the basement