Construction Update – 3rd September 2021

Sep 3, 2021Construction Updates

This week we have carried out the following works on the individual blocks:

Block C:

  • Steelwork erected
  • Concrete poured for level 8 on C1

Block D1:

  • Concrete poured for level 13
  • Decking laid for level 14
  • Façade works
  • Prefabricated mechanical, electrical, plumbing and heating (MEPH) modules installed
  • Bathroom pods delivered ready for installation

Block D2:

  • Concrete poured for level 16
  • Façade works
  • Prefabricated MEPH modules installed
  • Bathroom pods delivered ready for installation

Block E:

  • Roofing works