This week we have carried out the following works on the individual blocks:

Block C:

  • Concrete poured for C1 level 9
  • Concrete poured for level 1 podium
  • Decking laid for C2 level 9

Block D1:

  • Concrete poured for level 13
  • Façade works
  • Prefabricated mechanical, electrical, plumbing and heating (MEPH) modules installed
  • Bathroom pods delivered ready for installation

Block D2:

  • Decking laid for level 18
  • Façade works
  • Prefabricated MEPH modules installed
  • Bathroom pods delivered ready for installation

Block E:

  • MEPH works in the basement