This week we have carried out the following works on the individual blocks:

Block C:

  • Decking laid for level 5 on C1
  • Construction of the steel frame for the cinema started

Block D1:

  • Concrete poured for level 10
  • Columns erected level 10 to 11
  • Mechanical, electrical, plumbing and heating (MEPH) modules installed

Block D2:

  • Decking laid for level 14
  • MEPH modules installed

Block E:

  • Concrete poured for level 4