Construction Update – 20th August 2021

Aug 20, 2021Construction Updates

This week we have completed the following works on the individual blocks:

Block C:

  • Steelwork continues to be erected
  • Concrete poured for level 7 on C1
  • Concrete poured for level 5 on C2
  • Decking laid for level 6 on C2

Block D1:

  • Concrete poured for level 12
  • Prefabricated mechanical, electrical, plumbing and heating (MEPH) modules installed to levels 7, 8 and 9
  • Balconies and windows installed

Block D2:

  • Concrete poured for level 15
  • Bathroom pods delivered for level 7
  • Prefabricated MEPH modules installed to levels 8, 9 and 10
  • Fa├žade panels installed for level

Block E:

  • Concrete poured for roof slab