This week we have carried out the following works on the individual blocks:
Block C:
- Concrete poured for the podium
Block D1:
- Decking laid for level 14
- Façade works
- Prefabricated mechanical, electrical, plumbing and heating (MEPH) modules installed
- Bathroom pods delivered ready for installation
Block D2:
- Concrete poured for level 18
- Façade works
- Prefabricated MEPH modules installed
- Bathroom pods delivered ready for installation
Block E:
- MEPH works in the basement