This week we have continued construction work on the internal road through site and completed the following works on the individual blocks.
Block C
- Concrete has been poured on the ground floor of building C1
- Concrete columns, to hold the floors in place, have been erected on building C2
Block D1
- Concrete has been poured on level 3
Block D2
- Concrete has been poured on level 5
- Started erecting the structure for level 6
- Installed protective screens for safe working at height
Block E
- Concrete has been poured to the ground floor