This week we have carried out the following works on the individual blocks:
Block C
- Concrete poured for level 9 on C1
- Steelwork erected for the podium
Block D1
- Concrete poured for level 13
- Façade works
- Prefabricated mechanical, electrical, plumbing and heating (MEPH) modules installed
- Bathroom pods delivered ready for installation
Block D2
- Concrete poured for level 16
- Façade works
- Prefabricated MEPH modules installed
- Bathroom pods delivered ready for installation
Block E
- Steelwork erected on the roof