Construction Update – 17th September 2021

Sep 17, 2021Construction Updates

This week we have carried out the following works on the individual blocks:

Block C

  • Concrete poured for level 9 on C1
  • Steelwork erected for the podium

Block D1

  • Concrete poured for level 13
  • Façade works
  • Prefabricated mechanical, electrical, plumbing and heating (MEPH) modules installed
  • Bathroom pods delivered ready for installation

Block D2

  • Concrete poured for level 16
  • Façade works
  • Prefabricated MEPH modules installed
  • Bathroom pods delivered ready for installation

Block E

  • Steelwork erected on the roof