Oct 22, 2021 | Video Updates
We captured some footage during our event to celebrate one year on site at the Lewisham Gateway project. Hear from some of the team about progress so far in the video below.
Oct 22, 2021 | Video Updates
We had a videographer come down to site during our Safety Stand Down event to capture some highlights of the day. Watch the video below to find out more about the event and why we hold them every year.
Oct 22, 2021 | Social Value
After building a relationship with Barnardo’s YouthBuild throughout the duration of the project, we worked with them to find two suitable candidates for two weeks of work experience that had completed their construction skills course. The course aims to train young...
Oct 22, 2021 | Construction Updates
This week, we have carried out the following works on the individual blocks: Block C: Concrete poured for level 10 on C2 Façade works to level 6 on C1 and level 3 on C2 Prefabricated mechanical, electrical, plumbing and heating modules installed Hoist climbed to level...
Oct 22, 2021 | Construction Updates
This week, we have carried out the following works on the individual blocks: Block C: Concrete poured for level 10 on C2 Façade works to level 6 on C1 and level 3 on C2 Prefabricated mechanical, electrical, plumbing and heating modules installed Hoist climbed to level...